Glencoe · Public project evidence
Green Bay and Harbor signals target accessibility and emergency access
The Village program proposes audible/tactile pedestrian signals and emergency-vehicle signal preemption at a specific intersection.
Documented status: In capital program; installation unconfirmed. Evidence dated . Later outcomes require a later source.
What the source records establish
Source record
Include the signal project in capital planning
The page lists a $100,000 project; no completed installation or contract is verified.
Source record
Add accessible signals and preemption
The proposed equipment supplies audible/tactile crossing feedback and prioritizes approaching emergency vehicles.
Proposals and possible effects
Possible effect
More usable crossing information
Documented project purpose is accessible crossing feedback; actual activation and performance require confirmation.
Possible effect
Emergency trips may benefit
Signal priority can improve flow for responding vehicles; no local response-time reduction has been measured here.
Properties and geography
Green Bay Road at Harbor Street. Scope: site. U.S. Census geocoder locator for GREEN BAY RD & HARBOR ST, GLENCOE, IL, 60022. This locates an address or named intersection, not a project boundary or an affected area.
Official location sourceExamples on referenced streets. These links do not establish that a parcel is affected, charged, approved or eligible.
Decision timeline
Signal controllers upgraded
The Village says earlier controller upgrades enable the new systems.
Listed planned start
The page lists May to August 2026, but still names contractor TBD; installation is not confirmed.
Funding and who may pay
Conditions and public commitments
Possible effect
More usable crossing information
Documented project purpose is accessible crossing feedback; actual activation and performance require confirmation.
Possible effect
Emergency trips may benefit
Signal priority can improve flow for responding vehicles; no local response-time reduction has been measured here.
Contracts, permits and completion evidence
2026-05 · Listed planned start
The page lists May to August 2026, but still names contractor TBD; installation is not confirmed.
What changed in this edition
The permanent timeline brings the previously reviewed source records together with funding references, conditions and property context. It does not assert a new project decision or completion after the evidence dates shown above. Future material updates will identify the changed claim and its source.
Open questions and next records
- Check procurement and activation evidence before treating the new crossing equipment as present.
Official source records
- 2026 capital project: Green Bay and Harbor crossing
Village of Glencoe · Reviewed 2026-09-06 · Pedestrian Crossing Improvements at Green Bay and Harbor