Lake Avenue combines intersection and water-infrastructure changes
The project studies road and crossing improvements with drainage, watermain renewal and lead-service replacement between Green Bay and Sheridan.
Documented status: Component recommendations; final construction status unconfirmed. Evidence dated . Later outcomes require a later source.
What the source records establish
Source record
Components advance separately
A commission or committee decision is not the same as a final construction contract.
Source record
Renew the street and buried infrastructure
Proposed work includes road rehabilitation, drainage structures, curb ramps, water mains and lead services within the limits.
Proposals and possible effects
Possible effect
Access and utilities may improve together
Bundled work can change crossing conditions and utility service at the same locations; construction phasing and measured benefits need later evidence.
Properties and geography
Lake Avenue, Green Bay Road to Sheridan Road. Scope: corridor. U.S. Census geocoder locator for LAKE AVE & GREEN BAY RD, WILMETTE, IL, 60091. This locates an address or named intersection, not a project boundary or an affected area.
Official location sourceExamples on referenced streets. These links do not establish that a parcel is affected, charged, approved or eligible.
Decision timeline
Transportation Commission reviews components
Project site records support for intersection and crossing changes, but not the bike-facility component.
Municipal Services Committee reviews components
The page records support for the intersection and crossing, with partial support for the corridor facilities.
Funding and who may pay
Conditions and public commitments
Possible effect
Access and utilities may improve together
Bundled work can change crossing conditions and utility service at the same locations; construction phasing and measured benefits need later evidence.
Contracts, permits and completion evidence
A distinct contract, permit, payment or completion record has not been summarized in this edition. Approval and proposed work alone do not establish completion.
What changed in this edition
The permanent timeline brings the previously reviewed source records together with funding references, conditions and property context. It does not assert a new project decision or completion after the evidence dates shown above. Future material updates will identify the changed claim and its source.
Open questions and next records
- Read later Village Board actions and engineering updates; preserve separate statuses for each component.
Official source records
- Lake Avenue proposed improvements and committee decisions
Village of Wilmette project team · Published 2025-07-21 · Reviewed 2026-09-06
- Village link to Lake Avenue project website
Village of Wilmette · Reviewed 2026-09-06